Review current status and future changes to the Project Management Institute’s (PMI) Project Management Body of Knowledge(PMBOK).

Review current status and future changes to the Project Management Institute’s (PMI) Project Management Body of Knowledge(PMBOK). There are dramatic changes from Version 6 to Version 7.

Using OABC format, provide an overview of the current version, the proposed changes, reason for the changes, and the implementation plans. What if at all are these changes impacting your pursuit of project management certification.

This paper should be 3-5 pages, OABC formatted, include appropriate citations (APA Style).

find the cost of your paper

set up and solve a case-study example of the light-intensity distribution in a photochemical reactor.

Photochemical reactor modeling: a case-study problem. Although radiation is important in heat transfer, an analogous model can be used in the design of photochemical reactors. The modeling of these reactors….

Write a critique on this technique of secondary-emission measurement.

Secondary-emission measurement: a case-study problem. An indirect way of measuring of secondary emission from ponds or large bodies of water used in waste treatment is to measure the concentration and….

set up a mass transfer model and evaluate the variation of the local mass transfer coefficient at various locations in the plate.

Chemical vapor deposition (CVD) on an inclined susceptor: a case-study problem. An important application of convective mass transfer theory is in CVD processes employed to coat surfaces with thin films….