List at least three risks (schedule, cost, requirements, quality or operational risks) that could cause the project to be late, over budget or a failure.

A project has been awarded to you by one of your client related to design and host a web portal for online buying and selling of pets. This platform will act as a bridge between sellers and buyers where both the parties can negotiate regarding selling and purchasing of pets and their accessories. The payment options will be both online secure payment and cash on delivery (COD).
This project requires you to pay some visits to pets’ buying and selling markets for information gathering and analysis. Keeping in mind the recent pandemic has just subside and lockdown is over. Your client is asking you to complete this portal in 15 days’ time.
1. List at least three risks (schedule, cost, requirements, quality or operational risks) that could cause the project to be late, over budget or a failure.2. What mitigation techniques you will followed for the above risks?

find the cost of your paper

set up and solve a case-study example of the light-intensity distribution in a photochemical reactor.

Photochemical reactor modeling: a case-study problem. Although radiation is important in heat transfer, an analogous model can be used in the design of photochemical reactors. The modeling of these reactors….

Write a critique on this technique of secondary-emission measurement.

Secondary-emission measurement: a case-study problem. An indirect way of measuring of secondary emission from ponds or large bodies of water used in waste treatment is to measure the concentration and….

set up a mass transfer model and evaluate the variation of the local mass transfer coefficient at various locations in the plate.

Chemical vapor deposition (CVD) on an inclined susceptor: a case-study problem. An important application of convective mass transfer theory is in CVD processes employed to coat surfaces with thin films….