determine the expected project completion time? and explain why project scheduling is important and the role of PERT and CPM techniques in project scheduling 

1. You have signed a contract to build a Garage for TEAM Company.Draw the PERT network(AOA) for the project, b) compute the ES, EF, LS and LF time of the project, c) calculate the total float of the project, d) identify the critical path and critical activities, e) determine the expected project completion time? and explain why project scheduling is important and the role of PERT and CPM techniques in project scheduling (6 Marks)


View complete question »

Activity Activity Description Predecessor Activity Duration (Weeks)

A

Pour foundation
find the cost of your paper

set up and solve a case-study example of the light-intensity distribution in a photochemical reactor.

Photochemical reactor modeling: a case-study problem. Although radiation is important in heat transfer, an analogous model can be used in the design of photochemical reactors. The modeling of these reactors….

Write a critique on this technique of secondary-emission measurement.

Secondary-emission measurement: a case-study problem. An indirect way of measuring of secondary emission from ponds or large bodies of water used in waste treatment is to measure the concentration and….

set up a mass transfer model and evaluate the variation of the local mass transfer coefficient at various locations in the plate.

Chemical vapor deposition (CVD) on an inclined susceptor: a case-study problem. An important application of convective mass transfer theory is in CVD processes employed to coat surfaces with thin films….